Structural engineering
How to choose a structural engineer in Cyprus
What can actually be checked about a structural engineer in Cyprus, which registrations matter, and what a fee quote should itemise before you sign it.
8 min read

Photo: Mikhail Nilov on Pexels
Andreas covers the structural end of the trades: what holds a building up, what keeps water out of it, and which of the two a given job actually affects. He records quoted prices per trade and checks contractor registrations against ETEK.
Reviewed by Yiannis Demetriou, Reviewer
Published
Two things decide whether this appointment goes well, and neither of them is on anybody's website. The first is whether the person who signs your drawings is registered with ETEK and will give you the registration number in writing. The second is whether the fee covers site inspections and the final certification, or stops at a stamped drawing and leaves you looking for someone else the moment the authority comes back with a question.
Everything below is aimed at those two points. Fee comes third, and it moves less than most people expect.
What can actually be verified
Separate what you can check from what you are being asked to take on trust. Four things are checkable, and between them they take an afternoon.
ETEK registration. The Scientific and Technical Chamber is the statutory body for engineers here. Its registration is not a trade association badge you buy — it requires an accredited degree, and it can be withdrawn. Ask for the number and check it with the chamber. Anyone who has one gives it to you in a single sentence.
The branch they are registered in. ETEK registers professionals by discipline, and civil engineering is the branch covering structural design. Architects, mechanical engineers and surveyors are ETEK-registered too, and none of that makes them the right signature on a beam calculation. Ask which branch, not just whether they are members.
The legal entity. If you are engaging a practice rather than an individual, the company that issues the invoice should be the company named in your appointment letter. Registration under Companies Law Cap. 113 is public and searchable, and shows the incorporation date and standing.
Professional indemnity insurance in force. Not the same thing as a contractor's public liability policy, and it is the cover that matters if a design turns out to be wrong. Ask for the certificate, and read the dates and the limit against the size of your project.
What none of that tells you is whether the design will be sensible. A registered engineer can produce a structure that is safe and twice as expensive to build as it needed to be. No register grades judgement, and this site publishes no ratings, stars or testimonials of any kind — our structural engineering pages order practices on what can be documented, and the weighting is set out on the methodology page.
Registrations that matter
The practical consequence is simple. For anything that changes how loads travel through a building — removing or opening up a wall, adding a floor or a roof terrace, enclosing a veranda, cutting a new opening in a shear wall, adding a pool or heavy planting to a slab — the drawings submitted with your permit application have to be certified by an ETEK-registered professional. A drawing without that stamp is not a cheaper option. It is not an option.
Structural design here follows the Eurocodes with the Cypriot national annex, which is what gives the seismic loading its local values — worth remembering when advice comes from someone working off experience elsewhere. Most housing stock is a reinforced concrete frame with non-loadbearing clay block infill, and the walls people most want to remove are frequently the infill ones. That is good news, but only after somebody qualified has confirmed which is which.
Two other registrations are worth a question:
- VAT registration, because a quote that is silent on VAT is not comparable with one that includes it. Ask which rate applies to your works and whether the figure quoted is inclusive.
- The contractor's own engineer. Where a builder tells you they "have an engineer", ask to speak to that person directly and get their ETEK number. An engineer engaged by and paid by your contractor is not reviewing your contractor.
Questions to ask
Who visits the site, and who signs?
In smaller practices these are the same person. In larger ones a junior does the survey and a principal signs. Neither is wrong, but you should know which it is, and the signing engineer should have been on site at least once.
Is a site visit needed before you can quote?
For a condition survey or an alteration to an existing building, an engineer who quotes a fixed fee without seeing the building is quoting for a document, not for a problem. For a new build on drawings, a desk quote is normal.
What exactly is delivered?
Calculations, drawings, the permit submission set, a specified number of site inspections during construction, and the final certification are five separate things. Ask which of them the fee covers.
What happens when the authority asks for revisions?
Comments back from the building authority are routine, not a failure. Ask whether responding to them is inside the fee or charged as extra time, and get the answer in the quote.
What is excluded?
Topographic survey, soil investigation and concrete testing sit outside most engineers' fees and are frequently needed anyway. On an older block, or a plot with any history of movement, assume at least one applies.
Have you submitted to this authority before?
Each district's building authority has its own habits about what it wants to see and how it wants it presented. An engineer who submits there regularly costs you less in elapsed time than one who does not.
What a good quote looks like
Fees are quoted on three bases and are not comparable until you convert them: a fixed sum for a defined deliverable, an hourly or daily rate, or a percentage of construction value. The percentage basis is common on new build and is the one to read carefully, because it needs a stated construction value, a stated point at which that value is fixed, and an answer to what happens if build cost rises during the works.
A quote you can actually compare has all of the following on it:
- The scope described as deliverables, not as a job title.
- The fee basis stated, and the assumptions the fee depends on.
- A number of site inspections, expressed as a number.
- Whether permit application fees, printing and authority charges are inside or outside the figure.
- VAT stated explicitly.
- A timeline from instruction to issued drawings, and a separate note of what is outside their control once it is with the authority.
- Named exclusions.
Give every practice you approach the same scope in writing. The single most common reason two structural fees look far apart is that one includes construction-stage inspections and certification and the other stops at the drawing.
Less suitable when
A markedly lower fee is usually a narrower scope rather than a better deal. Read the deliverables list first and the total second.
Warning signs
Advice on load-bearing walls given verbally on site, with nothing in writing. If it is safe it can be written down. If it cannot be written down, it is not advice, it is an opinion you cannot use.
Reluctance to give the ETEK number. There is no legitimate reason for this.
A quote with no site visit for alteration work. You cannot assess an existing building from a photograph of it.
Pressure to begin demolition before the permit is issued. This puts the risk entirely on you, and it is your name on the property.
No professional indemnity certificate. Or one whose dates do not span your construction period.
A survey report on an older block that mentions no testing. In the 1970s–1990s apartment stock that dominates renovation work in areas such as Strovolos, cover and reinforcement condition are the questions. A report answering neither has not looked.
Silence about ground conditions where ground is known to move. Parts of Pissouri have documented movement, and a structural survey is standard there before major work. An engineer quoting in that village who does not raise it has not asked where the property is.
Common questions
Do I need a structural engineer to remove an internal wall?
You need one to tell you whether you do. In the typical Cypriot concrete frame, many internal walls are non-loadbearing infill and can go without structural work, but the ones that are not look identical from the room. The assessment is cheap. Discovering the answer afterwards is not.
What is the difference between an architect and a structural engineer here?
Both are ETEK-registered, in different branches. The architect is responsible for the design, the planning application and how the building works as a building. The structural engineer is responsible for whether it stands up and what happens to it in an earthquake. On anything beyond a small alteration you will need both, and they should be talking to each other before either quotes.
Does adding solar panels need a structural engineer?
It depends on the roof and the mounting system. A lightweight array on a sound concrete roof usually does not; a ballasted system, or a raised frame doubling as shading, is worth an assessment. If the installer says no engineer is needed, ask what the added load per square metre is and how they know the slab takes it.
Can I use an engineer qualified in another EU country?
Qualifications gained elsewhere in the EU can be recognised, but it is registration with ETEK that allows a professional to certify drawings for submission in Cyprus. If you have someone in mind, the sequence is registration first, appointment second. Ask ETEK directly about the recognition route rather than relying on the engineer's own account of it.
How long does a structural report take?
The site work is usually a matter of hours. What sets the elapsed time is whether any testing is needed, how quickly you can get access to every part of the building including the neighbour's side of a party structure, and the practice's current workload. Ask for a date rather than a duration, and ask what would push it.
Should I appoint the engineer or let the contractor do it?
Appoint them yourself. The value is independence, and it also means the drawings and calculations are yours if you change contractor midway.
Structural engineering practices with recorded registrations
8 companies covering this area.
CyRIC
Makedonitissa, Nicosia
CyRIC is an engineering practice in Makedonitissa, in the Nicosia district. Recorded services include structural calculations, surveys, certificates.
- Structural calculations
- Surveys
- Certificates
Polart Construction
Strovolos Iii, Nicosia
Polart Construction is an architecture practice in Strovolos Iii, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Karyatides
Strovolos, Nicosia
Karyatides is an architecture practice in Strovolos, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Lordos Architects
Tabakhane, Nicosia
Lordos Architects is a company in Tabakhane, in the Nicosia district.
Andreas Vlittis
Paralimni, Famagusta
Andreas Vlittis is an architecture practice in Paralimni, in the Famagusta district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Nicolaides Viana Partnership
Limassol Centre, Limassol
Nicolaides Viana Partnership is an architecture practice in Limassol Centre, in the Limassol district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
P. A. Constructions Ltd.
Engomi, Nicosia
P. A. Constructions Ltd. is an architecture practice in Engomi, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Andreas S. Hadjizacharias Ltd
Agios Nikolaos, Limassol
Andreas S. Hadjizacharias Ltd is an architecture practice in Agios Nikolaos, in the Limassol district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Sources
- ETEK — Cyprus Scientific and Technical Chamber — retrieved 2026-07-24
- Department of Town Planning and Housing — planning and building permits — retrieved 2026-07-24
- Department of Registrar of Companies and Intellectual Property — retrieved 2026-07-24

Thinking of doing this?Get up to five quotes, free.
Describe the job once and we will gather quotes from companies that actually do this kind of work.