How to choose a building contractor in Cyprus
The registrations you can check on a Cyprus building contractor, what a real quote itemises, and the warning signs that are worth walking away from.
8 min read

Photo: Angie Reyes on Pexels
Andreas covers the structural end of the trades: what holds a building up, what keeps water out of it, and which of the two a given job actually affects. He records quoted prices per trade and checks contractor registrations against ETEK.
Published
What you are buying from a main contractor is not blockwork. It is coordination and a single point of responsibility: one company that sequences the trades, carries the risk when two of them collide, and answers the phone eight months later. Everything worth checking before you appoint one comes back to whether that responsibility is real — whether there is a registered entity behind it, whether the works are within what they are permitted to take on, and whether the contract says who pays when the programme slips.
What can actually be verified
Four things, and they are all documents.
The company. The Registrar of Companies is public: legal name, registration number, incorporation date, standing. A contractor quoting for a two-storey extension whose company was incorporated last spring is not automatically a problem, but it is a question you should ask out loud.
The registration class. Building and technical works contracting in Cyprus is a registered activity. Registration is granted by category and by class, and the class limits the value of works a contractor may lawfully undertake. This is the single most under-asked question in the whole process. Ask for the category and class, and ask whether your project sits inside it. A contractor working outside their class has a problem that becomes your problem at completion.
The professionals behind the drawings. Structural work, extensions and anything that changes the building envelope needs drawings certified by an ETEK-registered engineer or architect. ETEK registration is a genuine qualification — it requires an accredited degree and it can be withdrawn. Ask for the registration number of the professional who will certify and supervise. Anyone who has one will recite it without pausing.
Insurance in force. Public liability and employer's liability, both current on the dates of your works, for sums that bear some relation to the value of the job and the building next door. Ask for certificates and read the dates.
Registrations that matter
The permit chain runs in a fixed order and the contractor is not at the top of it.
Planning permission comes first, from the planning authority, and deals with what may be built on the plot. The building permit follows, from the municipality or district authority, and deals with how it is built. On completion, a certificate of final approval confirms what was built matches what was permitted — and that document is what a buyer's lawyer will ask for years later.
The point that catches people out: the permit is held by the owner, not by the contractor. You are the applicant. If a contractor offers to handle permits, they are handling your application, and the exposure stays with you. Ask to see every submission before it goes in, and keep copies.
Alongside that sit the ordinary business registrations — VAT, employer registration for social insurance on the crew, and a bank account in the company name rather than a personal one. None of these prove competence. All of them prove there is something to hold responsible.
Questions to ask
Who is on site, and how often?
Ask for the name of the site manager and the number of days a week they are physically there. A contractor running four jobs with one manager is a programme risk, not a moral failing — but you should know before you sign.
Which trades are subcontracted, and are they named?
Almost all of them will be. What you want is whether the subcontractors are regular or found on the week, and who holds the relationship when something needs putting right after handover.
How are variations priced?
Agree the rates before you need them, not on the day the ground opens up. Labour rates, common materials, and a written instruction requirement for anything outside the scope. Verbal variations are the most common source of disputes on Cypriot residential jobs.
What is the programme, and what is on the critical path?
A programme in weeks with milestones you can see from the doorway — slab, envelope closed, first fix, plaster, second fix, handover. Ask which item, if it slips, moves everything after it. Long-lead items such as aluminium glazing and imported joinery usually sit there.
What happens in August, and what happens in the rain?
Site hours contract in the summer heat and concrete pours get moved to early morning. On the coast, refurbishment work in Ayia Napa and Protaras is packed into November to March because the properties are occupied the rest of the year, and good contractors are booked out for that window well in advance.
What have you built near here that I can look at?
Addresses, not photographs. A contractor working regularly in your district will have three within a short drive.
Site conditions belong in this conversation too. On the hillside plots around Peyia, steep access roads limit the size of crane and delivery vehicle that can reach the plot, which changes how the frame goes up and what it costs. In parts of Pissouri, known ground movement makes a structural survey standard before major work rather than an optional extra. A contractor who has worked in your area will raise these before you do.
What a good quote looks like
Those ranges are read from our records at page load rather than typed into this article, so they stay current. But the shape of a quote tells you more than the total does. A comparable one contains:
- Preliminaries, itemised. Site set-up, temporary water and power, welfare, scaffolding, skips and disposal, insurance, supervision. When these are missing from a quote they have not been deleted from the job, only from the paperwork.
- A breakdown by trade and by stage rather than one figure per floor.
- Provisional sums clearly flagged — the allowances for tiles, sanitaryware, ironmongery, kitchen. Ask what specification the allowance assumes, because an allowance set low is the most polite way to make a quote look competitive.
- Exclusions written down. What is not in the price should be a list, not a silence.
- The permit position stated, including which drawings and certificates are included and which are for your appointed engineer or architect.
- VAT shown separately, with the rate applied to your project stated rather than assumed.
- Payment tied to verifiable stages, never to calendar dates. You pay when the slab is poured, not on the first of the month.
- Retention and a defects period. A percentage held back until the defects period ends, and the length of that period written into the contract. Both are negotiable. Neither should be absent.
- A signed contract, not an accepted quotation by email.
Issue the same written scope to every contractor. Three quotes priced against three different assumptions are three different jobs, and comparing them is arithmetic with no meaning.
Warning signs
A demand for a large payment before anything happens on site, with no invoice and no stage attached to it. This is the failure mode that costs Cypriot homeowners the most money, and it is the easiest to avoid.
A quote far below the others. The gap is somewhere — usually preliminaries, insurance, or a provisional sum set at a number nobody could build to.
Reluctance to name the ETEK-registered professional certifying the drawings, or a suggestion that the drawings can be sorted out later. On anything structural, the sequence is not optional.
"We can start before the permit comes through." Some enabling works legitimately precede a permit. Structural works do not, and unauthorised construction is a title problem that surfaces at sale, when it is expensive and slow to regularise.
A price that drops if you pay cash and skip the invoice. That discount is your evidence, your VAT position and your recourse, sold back to you.
No written contract, or a one-page document with a total and a start date. Also: no employer's liability cover while employing a crew, an unwillingness to give addresses of completed work, and pressure to sign before you have seen the breakdown.
Common questions
Do I need a main contractor, or can I appoint trades directly?
You can appoint trades directly, and on a single-room job it often costs less. What you take on is the sequencing, the standing-about time when one trade waits for another, and the argument about whose fault a defect is. On anything involving structure, services and finishes together, that coordination is the product.
How much should the deposit be?
There is no fixed figure, and the useful question is what it is for. A payment against a specific ordered item, invoiced, is normal. A percentage of the contract value handed over before mobilisation, uninvoiced and unattached to any stage, is not.
Who applies for the permit, me or the contractor?
You do, as owner. Your engineer or architect prepares and submits it. A contractor may run the administration on your behalf, but the application and the liability stay with you, which is why you should read what is submitted.
What does the certificate of final approval do for me?
It confirms the completed building matches the permit. Without it, the property is harder to sell, harder to mortgage, and the discrepancy has to be regularised before title moves. Treat it as part of the job, not as paperwork afterwards.
How do I compare a contractor from another district?
Look at travel and at whether they know the local authority. Cyprus is small enough to drive across in a morning, but a contractor who has never submitted to your municipality will be slower through the permit stage, and distance from their base shows up inside their day rates either way.
Should the structural engineer be chosen by the contractor?
Appoint your own. The engineer certifies and supervises, and independence from the company doing the building is the entire value of that role.
Building contractors with verified registrations
8 companies covering this area.
Polart Construction
Strovolos Iii, Nicosia
Polart Construction is an architecture practice in Strovolos Iii, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
P. A. Constructions Ltd.
Engomi, Nicosia
P. A. Constructions Ltd. is an architecture practice in Engomi, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
SB Pazzleco
Acropolis, Nicosia
SB Pazzleco is a construction company in Acropolis, in the Nicosia district.
Grinelion Property Developer
Kiti, Larnaca
Grinelion Property Developer is an estate agent in Kiti, in the Larnaca district.
Fabretti Construction
Agioi Omologites, Nicosia
Fabretti Construction is an architecture practice in Agioi Omologites, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Stephanos Philippou Developers
Oroklini, Larnaca
Stephanos Philippou Developers is an estate agent in Oroklini, in the Larnaca district.
C Roushas & Co.
Acropolis, Nicosia
C Roushas & Co. is a construction company in Acropolis, in the Nicosia district.
Mimap Construction
Latsia, Nicosia
Mimap Construction is a business in Latsia, in the Nicosia district.
Sources
- Department of Registrar of Companies and Intellectual Property — retrieved 2026-07-24
- ETEK — Cyprus Scientific and Technical Chamber — retrieved 2026-07-24
- Department of Town Planning and Housing — retrieved 2026-07-24

Thinking of doing this?Get up to five quotes, free.
Describe the job once and we will gather quotes from companies that actually do this kind of work.